LEV Re-Location 

Efficient relocation and installation of industrial LEV filtration system

  • This project involved the strip out and re-location between 2 of our customers sites.

  • Project length - 3 weeks

Modified an existing pneumatic conveying system to convey the waste to the customers pelleting plant.

Installed the new ducting leg to replace an existing smaller filter.

Erected the new frame and filter.

Removal of the existing filter plant, fan and part of the supporting structure.

Transported to one of our customers other sites.

Fabricated new supporting frame work, whilst utilising some of the existing steels to minimise costs.

Project Consisted Of:

Screenshot 2026-03-10 at 14.40.13.png

Our Case Studies

Click image to view case study

Screenshot 2026-03-10 at 14.40.22.png

Steelwork Overhaul

Screenshot 2026-03-10 at 14.40.13.png

LEV Re-location

Screenshot 2026-03-10 at 14.40.30.png

New Packing Line Ancillarys

Enquire Image.png

Enquire With Us

If you'd like to enquire with us please fill out the form and a member of our team will get in touch.

Enquiry Form

Which Service?
bottom of page