Steelwork Overhaul

Complete steelwork replacement to restore critical fan room structure

  • JJA Engineering were commissioned to replace the flooring and associated steel work in the fan room of a germination vessel.

  • Project length - 4 weeks

    Our site teams worked in two shifts of 4 to ensure we minimised down time for our client.

Re-install the fan and roof.

Fabricate, galvanise and install new steelwork and flooring.

Imported the European size beams from the continent to our workshop.

Removal of the buildings roof to allow access to crane out the 3t fan (full contract lift).

Removal of the existing flooring and supporting steelwork.

Replicate the entire floor and supporting steelwork using CAD.

Project Consisted Of:

Screenshot 2026-03-10 at 14.40.22.png

Our Case Studies

Click image to view case study

Screenshot 2026-03-10 at 14.40.22.png

Steelwork Overhaul

Screenshot 2026-03-10 at 14.40.13.png

LEV Re-location

Screenshot 2026-03-10 at 14.40.30.png

New Packing Line Ancillarys

Enquire Image.png

Enquire With Us

If you'd like to enquire with us please fill out the form and a member of our team will get in touch.

Enquiry Form

Which Service?
bottom of page