New Packing Line Ancillarys

Design and installation supporting a new high-capacity packing line

Supply and install a stainless steel hand tipping station to allow remix of any damaged bags.

Design, fabricate and install a Stainless steel header bin, steelwork and stainless steel access platform to sit above the new packing line.

Design and spec and new LEV system to replace an older and inadequate filter system.

Survey the existing pneumatic conveying lines to ensure they were capable of the new increased capabilities of the packing line.

Filter installation and all ducting.

Project Consisted Of:

Screenshot 2026-03-10 at 14.40.30.png

Our Case Studies

Click image to view case study

Screenshot 2026-03-10 at 14.40.22.png

Steelwork Overhaul

Screenshot 2026-03-10 at 14.40.13.png

LEV Re-location

Screenshot 2026-03-10 at 14.40.30.png

New Packing Line Ancillarys

Enquire Image.png

Enquire With Us

If you'd like to enquire with us please fill out the form and a member of our team will get in touch.

Enquiry Form

Which Service?
  • Our customer invested in a new state of the art 25kg bagging line to replace an existing line and commissioned JJA Engineering to carry out the project.

  • Project length - 6 weeks